Ford Transit Bulkhead Piece (High Roof)
Reliable shipping
Flexible returns
One piece, one job: keeping your ceiling on plane through the compound curve where the roof meets the bulkhead.
If the only thing standing between you and a finished front end is the curve at the bulkhead, this is the part — sold on its own rather than bundled with pillars you do not need.
It is a transition piece. Your ceiling arrives at the curve at whatever thickness you built it, anywhere from 1/4" to 3", and this holds it on plane so the ceiling reads as a single surface rather than stepping down where the roof shape changes.
Which trim kit should you actually buy?
- Buy this if the bulkhead curve is your only remaining problem on a high-roof Transit.
- Buy the Front Trim Kit if you also need the B-pillars.
- Buy the Full Interior Trim Kit if you need front and rear.
- Confirm your finished ceiling thickness is between 1/4" and 3".
Fitment
| Vehicle | Ford Transit high roof, 2015 and newer |
| Area | Bulkhead / front ceiling transition |
| Ceiling thickness supported | 1/4" to 3" finished |
| Finish options | Standard raw ABS, Matte, Upholstered Grey Heather, Upholstered Black |
Finish options and specifications
| Pieces | 1 bulkhead transition piece |
| Material | ABS |
| Standard | Raw ABS — paint or upholster |
| Matte | SEM Ultra-Black painted |
| Upholstered | Marathon Tweed — Grey Heather or Black |
| Function | Holds finished ceilings 1/4" to 3" on plane through the compound curve |
| Install video | Published by GoCode Overland |
Upholstered options are made to order. Expect a fulfillment time of 1.5 to 2 weeks on any upholstered variant.
What's in the kit
- (1) Ford Transit high roof bulkhead trim piece
- Necessary additional install hardware
Installing it: sequence matters more than skill
Fit it before the ceiling goes up. That is the entire trick. The piece exists to give the ceiling something to land on; if the ceiling is already up, you are scribing the ceiling to the piece instead.
Position it against a physical mock-up of your finished ceiling stack rather than a planned dimension. Cut a 12" square of your actual build-up — furring, insulation, panel, cladding — hold it against the curve, and set the piece to that.
- Install before the ceiling panels.
- Set the position using a physical sample of your finished ceiling stack.
- Watch the manufacturer’s install video first.
- Upholstered variants are made to order: 1.5 to 2 weeks.
Questions we get asked about this part
When in the build should I install it?
Before the walls and the ceiling panels. GoCode is explicit about this and we agree: fitting the trim first lets the wall and ceiling panels land against the trim flanges, which is what produces the factory-looking joint. You can install these kits after the panels are up, but it requires modifications and additional labour, and the joints never look as clean.
Can I paint or upholster it myself?
Yes. The parts are ABS, so they take an adhesion-promoting plastic primer and then any automotive topcoat. If you would rather not, order the Matte variant, which is finished in SEM Ultra-Black to kill the shine, or one of the upholstered variants.
Is this enough on its own?
It depends what is bothering you. If your walls already die cleanly into the cab area and only the ceiling transition looks wrong, yes. If the styrofoam blobs at the top corners are still exposed, you want the Front Trim Kit, which adds the B-pillar shells that cover them.
Pairs well with
- Marathon Tweed Fabric — the same fabric used on the upholstered options, sold by the yard
- Van conversion trim and finishing parts
Sold and shipped by Campervan Parts R Us, the parts counter of Noke Van Co. — a working van conversion shop in Roanoke, Virginia. If you are unsure whether this fits your van, email us the year, model and wheelbase and we will check it against a build sheet before you order.